What We Do

Services

Every service listed below is something we do regularly, not a catalog of things we might consider.

Home › Services

Everything we take on

Every job below is one we do ourselves across Sahuarita.

Deck Installation

We frame a new deck with joists spaced to span table for your board thickness, not just eyeballed at 16 inches. Footings go below the loose fill soil into undisturbed ground, which matters more here than people think once monsoon season soaks everything around a shallow post.

Deck Repair

Soft, spongy boards usually mean water's gotten into the end grain, and we replace those boards rather than flip them over and hope. We also reset posts that have started to lean and re-flash ledger boards where they've pulled away from the house.

Deck Staining & Sealing

Arizona sun breaks down an unsealed deck fast, graying pine in a single summer and chalking composite caps after a few years. We strip, sand if needed, and apply a finish rated for UV exposure, not a generic stain pulled off the shelf.

Custom Deck Design

We draw the layout before we cut a board, including stair placement, railing style and how the deck ties into existing doors and grade changes. This is where we catch problems like a step that would've been too steep or a beam that would've blocked a window.

Composite Decking Installation

Composite boards expand and contract more than wood in our heat, so fastener spacing and end gaps follow the manufacturer's chart, not a wood-framing habit. We've installed enough of it to know which brands hold their color here and which ones chalk out in two summers.

Deck Railing Installation & Repair

Baluster spacing has to pass a 4-inch sphere test under residential code, and we build to that even on a repair, not just a replacement in kind. Loose rail posts almost always mean the original screws went into a deck board instead of the framing underneath.

Deck Resurfacing

If the frame underneath is still sound, we can pull the old decking and lay new boards without rebuilding joists and footings from scratch. This is usually the cheaper route if the problem is just worn-out, splintering boards and not a structural issue.

Pergolas & Shade Structures

A deck that bakes all afternoon doesn't get used, so we build pergolas and shade structures sized to actually block the summer sun angle, not just look good in a photo. We frame these to tie into the existing deck posts where it makes sense structurally.

Deck Demolition & Removal

Old decks come down board by board, and we check what's underneath before building anything new on top of it. Sometimes the footings are fine and we reuse them, sometimes the whole substructure has to go.

Multi-Level Deck Construction

Sloped lots around Sahuarita often need a deck stepped down in sections instead of one flat run, which means extra beams, stair landings and more attention to how water sheds off each level. We size the framing for each tier separately instead of extending the top deck's joists further than they should go.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Sahuarita, AZ

This is the general range we work in for deck projects, call if an address falls just outside it.

Sahuarita, AZ
Tucson, AZ
Marana, AZ
Oro Valley, AZ
Nogales, AZ
Rio Rico, AZ
Green Valley, AZ
Vail, AZ
Corona de Tucson, AZ
Tubac, AZ
Amado, AZ
Common Questions

Things worth asking

Questions that tend to come up once a deck project is actually underway.

Do I need a permit to build a deck in Pima County?
Most decks higher than 30 inches off grade need a building permit and a footing inspection in Pima County, and attached decks usually need the ledger connection inspected too. Lower platform decks sometimes fall under a smaller exemption, but it's worth checking before lumber gets ordered.
How long does it take to build a deck?
A straightforward single-level deck usually takes one to two weeks from the first footing to the final board, depending on size and weather. Multi-level decks or ones with custom railing and stairs can run three to four weeks.
Can a deck be built within a set budget?
Decking material is the biggest lever on cost, since pressure-treated pine, cedar and composite boards vary a lot in price per square foot. Footprint, railing style or material choice can all be adjusted to land closer to a target number.
What kind of guarantee comes with the deck work?
Deck workmanship is covered for a set period after completion, and materials like composite decking carry their own manufacturer warranty separate from the labor guarantee. Any issue that's the builder's fault, a loose rail, a board fastened wrong, gets fixed at no charge.
Who do I deal with day to day during the project?
Questions during a deck project go to the same crew lead on site, rather than getting bounced between an office and the people actually building. That's usually the same person who gave the original quote.
What decking materials get used?
Pressure-treated pine, cedar, and composite decking from brands like Trex and TimberTech are all common choices for new decks. Pine costs less upfront but requires resealing every couple years in strong sun, composite costs more but takes almost no maintenance beyond washing it down.
Can I still use my yard while the deck is being built?
Part of the yard near the deck build site has to stay clear for materials and equipment, but the rest of the property stays usable during construction. The site gets walked beforehand so the fenced-off area is clear in advance.
What do I need to do to prepare the site beforehand?
Furniture, planters and anything breakable should be cleared away from the existing deck or build area before deck construction starts, and gate access needs to stay open for material delivery. Removing any old decking or debris is handled by the crew.
What happens if something unexpected turns up mid-job?
It's common to find a rotted ledger board, undersized footings, or termite damage once old decking comes up, since that's hidden until the boards are gone. Work stops and a price with photos is sent over before anything gets fixed that wasn't in the original deck quote.
How should a finished deck be looked after?
Pressure-treated wood requires resealing roughly every one to two years in direct Arizona sun to keep it from graying and cracking. Composite decking just takes periodic washing to clear dust and pollen, and railings should get checked once a year for screws that have worked loose.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (520) 654-4169